Notwithstanding some bad weather, which is not sparing any area of this world these days, it is nice to see our building construction progressing nicely in Tirana, as documented by some of today’s pictures.

Additionally, our own architects are at work to draw for us the subdivision of the Foundations’ first floor according to our specifications, which should be in line with our strategic plan, currently formulated in draft format. It will be modified and finalized, as needed, in the near future. More to come about this in due time.